You are here:
Container Terminal Kornik
Weser Power Plant, Bremen
Cooling water removal building – Power plant Moorburg
Serial production facility for offshore foundations
Flood Protection Binnenhafen – Schaartor Los 2
Extension Mole 2
Flood protection Weserbahnhof 1
Flood control Niederhafen Los 1
Berth 9 - Offshore base
Steel wind quay for heavy load
From the design to the handing over the key for profitable properties
Functional logistic facilities with high flexibility
Decade-long experiences in the construction of educational facilities
Process optimized office and production facilities
Attractive sales areas and intelligent room solutions
Building of ready to move in properties suited to the needs for the elderly
Representative and energy-efficient offices
Individual and economic sport facilities
A wide range of services – all facets of civil engineering
Customized specialized underground construction