Extension Mole 2

The lighthouse „Mole“ will be moved about 50 m westwards. The existing pierhead will damaged on a length of about 25 m and a 75 m long pier construction will be build.

The work includes following components and measures:   Survey works; Bulkhead as combined wall build of HZM 680 with AZ 26-700 with mounted steel waling and access jetty at the passages between old and new Mole.

Diagonal anchoring with bored injection piles Ø 63,5 mm   Bulkhead as combined wall build of piles with Ø 1420 mm and injected piles AZ 26-700 with diagonal anchoring by combined piles Ø 711 mm with PSt 600 with a length of about 64 m   Foundation of the lighthouse consisting of 3 tubes Ø 914 mm and pilecap.

Dolphin row with piles from Ø 1220 up to 1626 mm in front of the supporting structure.   Access jetty made of steel, width 1,20 m with railing on both sides. Damage, transport and storage of the old lighthouse including granite base; grounding and lightning protection

Buildingcosts: 5,44 € Mio.
Location: Brunsbüttel