…Reconstruction Berth 9.1 - Cuxhaven
The contract for the conversion of the LP 9.1 in Cuxhaven was awarded by a joint venture from the F+Z Baugesellschaft and Kurt Fredrich Spezialtiefbau GmbH. The execution took…
…Flood protection Cuxhaven
The existing dike line will be shortened and at the same time adapted to a higher level of protection. On land, this will be achieved by concrete structures, wave sheet piling and the…
… an order for an ancillary offer for the construction of the dolphin berth "Bridge 3" in Cuxhaven.The project included the construction of five bollard blocks equipped with fenders. They were…
… Kurt Fredrich Spezialtiefbau GmbH received the contract for the reconstruction of the Berth 9.3 in Cuxhaven. The execution took place between June 2016 and April 2017.
Specifications / Main Quantities: 368…
…Berth 9 - Offshore base
The order for the construction of the offshore LP 9 in Cuxhaven was generated by a joint venture of F+Z Baugesellschaft (today Depenbrock Ingenieurwasserbau), Josef Möbius, Tiefbau GmbH…
…Berth 9 - Offshore base
The order for the construction of the offshore LP 9 in Cuxhaven was generated by a joint venture of F+Z Baugesellschaft (today Depenbrock Ingenieurwasserbau), Josef Möbius, Tiefbau GmbH…
…Berth 9 - Offshore base
The order for the construction of the offshore LP 9 in Cuxhaven was generated by a joint venture of F+Z Baugesellschaft (today Depenbrock Ingenieurwasserbau), Josef Möbius, Tiefbau GmbH…
… of the Brunsbüttel pilot house can be reached flood-safe.
Employer: Wasser- und Schifffahrtsamt CuxhavenConstruction Period: Apr. 2018 – Ende Oktober. 2018Specifications / Main Quantities: Tubes /…