LNG-Terminal "Deutsche Ostsse" Mukran
To secure the energy supply, the industrial port in industrial port in Mukran for the import of liquefied natural gas by converting an existing jetty into a floating landing floating landing station. Depenbrock Ingenieurwasserbau together with Depenbrock Scandinavia ApS was awarded the contract in October 2023 to contract to convert the quay wall for loading the FSRU ship. For this purpose, 10 deep-founded bollard and mooring foundations were produced and equipped with quick release hooks. In addition, 4 further foundations were constructed for gas infrastructure components and 15 fender systems were installed. The work was started immediately in mid-October and completed on schedule at the end of December. The fenders were installed in January 2024.
The materials for the bollard foundations (steel support pipes) were rammed and partially driven into the ground. into the ground. Anchoring piles were installed using the drilling and grouting method. The anchoring piles were also widened in the area of the anchoring body using the jet grouting method in order to increase the external load-bearing capacity.
The short construction time was partly ensured by steel material from stock at Depenbrock. Could be ensured. The coordination of all those involved in the construction in a limited space the construction of the berth within a tight time frame also posed a berth was also a particular challenge.