Reconstruction Berth 9.1 - Cuxhaven
…Reconstruction Berth 9.1 - Cuxhaven
The contract for the conversion of the LP 9.1 in Cuxhaven was awarded by a joint venture from the F+Z Baugesellschaft and Kurt Fredrich Spezialtiefbau GmbH. The execution took…
2.
Flood protection Cuxhaven
…Flood protection Cuxhaven
The existing dike line will be shortened and at the same time adapted to a higher level of protection. On land, this will be achieved by concrete structures, wave sheet piling and the…
4.
Dolphin berth „Brücke 3“
… an order for an ancillary offer for the construction of the dolphin berth "Bridge 3" in Cuxhaven.The project included the construction of five bollard blocks equipped with fenders. They were…
5.
Dolphin berth „Brücke 3“
… an order for an ancillary offer for the construction of the dolphin berth "Bridge 3" in Cuxhaven.The project included the construction of five bollard blocks equipped with fenders. They were…
6.
Reconstruction Berth 9.3
… Kurt Fredrich Spezialtiefbau GmbH received the contract for the reconstruction of the Berth 9.3 in Cuxhaven. The execution took place between June 2016 and April 2017. Specifications / Main Quantities: 368…
7.
Berth 9 - Offshore base
…Berth 9 - Offshore base
The order for the construction of the offshore LP 9 in Cuxhaven was generated by a joint venture of F+Z Baugesellschaft (today Depenbrock Ingenieurwasserbau), Josef Möbius, Tiefbau GmbH…
8.
Berth 9 - Offshore base
…Berth 9 - Offshore base
The order for the construction of the offshore LP 9 in Cuxhaven was generated by a joint venture of F+Z Baugesellschaft (today Depenbrock Ingenieurwasserbau), Josef Möbius, Tiefbau GmbH…
9.
Berth 9 - Offshore base
…Berth 9 - Offshore base
The order for the construction of the offshore LP 9 in Cuxhaven was generated by a joint venture of F+Z Baugesellschaft (today Depenbrock Ingenieurwasserbau), Josef Möbius, Tiefbau GmbH…
10.
Marine Engineering: New construction pilot jetty
… of the Brunsbüttel pilot house can be reached flood-safe.
Employer: Wasser- und Schifffahrtsamt CuxhavenConstruction Period: Apr. 2018 – Ende Oktober. 2018Specifications / Main Quantities: Tubes / support…